top of page

Casa Jason

  • lakearenalrealestate
  • May 4, 2023
  • 3 min read

Casa Jason 2015

The process normally starts with a client purchasing one of our many properties. In the images below our client has purchased a rural farm with fantastic views of the Arenal Volcano, the lake, and the surrounding mountains. Then the LAREC team works closely with client to create the best possible design, homesite, and layout.


Once everyone is happy with the design and layout we begin by clearing the building site.

ree

Now that we have a suitable building site, it is time to start building something. So we begin with the footers.

ree

Work is Work, but on a day like this you have to stop and enjoy the view.

ree

Then we have some days that aren't so nice, but it is great to see the block work getting started.

ree

In Costa Rica the typical methode of construction is block between solid concrete column. We will lay block on top of the footings to the desired height and then come back and pour the columns.

ree

Another beautiful day with a fantastic view of the volcano. Now we can see the block walls reaching the height of the first floor. Next we will pour the columns, the header( or viga), and will start the second floor.

ree

Another beautiful day with gorgeous views of the mountains and volcano. In this image you can see the columns being formed up, when the columns are complete we will start the steel framing for the second floor.

ree

Now that the concrete work is complete on the second floor, it's time to get the roof on.

ree

Here we are starting the steel framing of the roof structure.

ree

Once the roof framing is complete, we put down the roof panels, then start closing in the overhangs and facias.

ree

Here the workers are starting the stucco on the facia and the eves. Next we will start stucco in the walls.

ree

Once the roof is on we can start making some progress on the interior. Here is an image of the ceiling framing for the tongue and groove wood ceiling.

ree

More progress being made on the interior.

ree

Here we are starting the madera negra natural wood column, very nice!

ree

Starting the lower roof.


ree

This is going to be a fantastic veranda.

ree

The master bedroom balcony is going to have a great view.

ree

The interior finishes are looking very nice.

ree

Things are moving along well. The lower roof is now on and the gutters on the upper roof.

ree

The floors are are in and soon we will start tile.

ree

Here is a good look at the progress from the front .

ree

The view from across the hill.

ree

Time to start thinking about paint colors!

ree

The stonework and madera negra post look really good together.

ree

The stonework will look great when it is finished.

ree

Very cool entryway.

ree

A look at the stonework in the bathroom.

ree

The tablea ceilings look so good.

ree

The master bedroom and closet.

ree

It was rainy on this day but the view from the MB is amazing.

ree

The master bathroom ceiling, is amazing!

ree

The veranda will be a great place to hangout.

ree

The stonework is looking amazing!

ree

ree

ree

ree

This tile is beautiful.

ree

The masterbathroom with stone and wood is fantastic!

ree

The exterior is really starting to come together.

ree

More great stonework!

ree

The view from inside the front door.

ree

The view from the upstairs hallway.

ree

Finishing up the exterior.

ree

Time for the finishing touches.

ree

It's all in the details.

ree

Time for some furniture.

ree

Great job on the rustic cabinets!

ree

We would like to say thank you to Jason for letting us post the pictures of his construction.

Time to turn over the keys!

Recent Posts

See All

Comments


bottom of page